In 2000, EPG took the lead in gaining ISO14001 surroundings administration certificate and thereafter handed the inspection of thoroughly clean creation and recycling financial system, profitable the title of “Zhejiang Green Organization”. Trying to keep in head that good services is the crucial to cooperating with customers, we try to meet substantial quality standards, offer aggressive costs and guarantee prompt delivery. Full use has been created of all types of superior strategies and engineering to reach excelsior producing.
Product Description
EPT parameter
World wide web height: 160-1500/1800/2000mm
Net thickness: three-40
Flange width: one hundred sixty-800mm
Flange thickness: six-40mm
Workpiece size: 4000-20000mm
Assembly spped: .5-6 m/min
Electrical assembly: the manufacturer is AC converter
Overall EPT: 10KW
EPT offer: AC 380V 50HZ 3phsaes
Model | Z15 | Z18 | Z20 |
web heigEPT mm | 200-1500 | 200-1800 | 200-2000 |
net thickness mm | 6-32 | ||
internet duration mm | 4000-15000 | ||
flange width mm | 200-800 | ||
flange thickness mm | six-40 | ||
assembly pace mm/min | 500-6000 | ||
feeding desk roller mm | 2600 times2 | ||
output desk roller mm | 2600 times2 | ||
centralized way | EPT website link system clamp, centralize and weld in the center automaticly | ||
pace management | EPTed AC frequency adjustor stepless modify | ||
enter volumn | 16KVA Besides wellding EPT | ||
welding system | 2 sets of CO2 safeguarding welding EPT |
Z15 H beam assembly EPT
Framework Basic principle
This EPT is largely composed of the following areas:
one. the primary motor assembly, |
2. pull rod on the method, |
three. the input roller, |
four. output roller, |
five. EPT program assembly, |
six. electric powered handle technique. |
The host assembly: the principal areas of the major incEPT:
the primary EPT roller (two groups), |
the world wide web clamp system (two teams), |
the wing plate clamping technique (three groups), |
lifting the main compression beam, |
H kind metal alignment element. |
a)the principal EPT roller
b) world wide web clamping technique
c) wing plate clamping technique
d) main lifting compaction beam
e) H steel partially aligned
Rod on the method (two teams)
Input and output rollers
EPT method assembly
*Ideal workpiece`s dimensions:
World wide web peak | 200-1500mm |
Internet thickness | six-40mm |
Flange width | one hundred sixty-800mm |
Flange thickness | 6-40mm |
Workpiece size | 4000-15000mm |
Assembly spped | .five-six m/min |
Electrical assembly: | the brand is AC converter |
Overall EPT | 10KW |
EPT offer | AC 380V 50HZ 3phsaes personalized |
Scope of provide and composition
A.Group vertical EPT body:
-the major engine assembly, world wide web clamp, flange plate clamping, and so on..
B.input and output roller assembly:
-roller of 2.6m/ * six competition competition, rod method and many others.
C.EPT technique:
-pump station, oil motor, high strain hose, EPT cylinder, and many others..
D. automated spot welding system:
-350A CO2 welding EPT resource*2pcs.welding, mechanical monitoring system, the EPT cylinEPTclamping mechanism and many others. (guide welding with out the products, automated welding).
E.electrical management program:
-electric powered cabinet, AC inverter, etc..
F.spare elements:
-O button three. The HH54PDC24V relay 2. The molten main 4A, every single three 6A.
EPT documents
Guidelines for the use of the total EPT (incXiHu (West Lake) Dis.Hu (West Lake) Dis. the EPT principle diagram, EPT theory diagram, donning components record, and many others.)
Frequency converter utilizing manual, EPT pump station handbook
Delivery checklist
EPT qualification certification
Basic graph
Manufacturing and self owned part
A. Basis (offered by the provider).
B. anchor bolts and expansion bolt.
C. EPT basis.