our products are promoting effectively in the American, European, South American and Asian marketplaces. In this way, our items have continued to gain marketplace acceptance and clients satisfaction over the previous few years. makes certain the balance and regularity of the important purpose of parts. Description of Factory direct employed corrugated roofing sheet EPT trapezoidal and roll previous tooth form bending for sale
The total corrugated roofing sheet creating EPT line incEPTs de-coiler, principal EPT, laptop controlling system and run out tables. Our EPTs are geared up with a personal computer controlling method. We basically program the pieces and duration we want in the pc and the wave panel EPT produces it instantly. The EPTs are easy to work and running stable.
Related EPT perhaps u like:
Working process
The complete line incEPTs decoiler, forming EPT, laptop managing system and run out tables. Our EPTs are equipped with a computer managing program to preserve products precise.
Primary parameters
NO |
Type |
Specification | |
1 |
Uncooked materials | Kind | PPGI |
Feeding width | 1250 mm | ||
Thickness | .3-.8 mm | ||
2 |
Decoiler | Operation | Manual |
WeigEPT apacity | 5 Tons | ||
three |
Primary physique | Roller station | eighteen row |
Diameter of shaft | seventy five mm | ||
Shaft substance | 45# with .05mm chrome | ||
Roller content | 45# with .05mm chrome | ||
Sort | EPT type | ||
Body | 300mm C-beam | ||
Frame thickness | sixteen mm | ||
EPT | Cr twelve | ||
Operation | EPT automated | ||
Working speed | 8-12 m/min | ||
4 |
EPT | Driving way | Chain 1 inch |
Main motor | five.five KW | ||
Voltage | 380V/50HZ, 3 stage | ||
five |
Control box | Electric box | PLC handle program, invEPTr |
PLC brand name | Delta made in EPTiwan | ||
Inverter brand | Delta produced in EPTiwan | ||
Language | EPT and EPT |
Handbook decoiler
It is passive variety could load coil by expend the blots correct at coil internal diameter. It’s effortless to operate and affordable remedy.
XiHu (West Lake) Dis.hu (West Lake) Dis. gadget
Adopt XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to handle the width and position of the steel sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the appropriate place and passed to the roll forming technique. Can change the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT position. It really is set structure to make positive can not transfer very easily.
Roll Forming Method:
Roll forming technique consist of EPT body, EPT technique, EPT motor and roll forming method.
A. EPT body adopts welding framework with shot blasting and painting remedy
B. All rollers substance adopt high good quality No. forty five steel, with tough chrome coated on floor, all treatment method by total CNC EPTs, to make certain the rollers with good rigidity and precision, and form ideal roofing sheet as per design and style.
C. All rolling shafts are made by substantial top quality No. forty five steel with quench and temper treatment method, so the shafts with good rigidity which could use for EPT tern with no deformation.
D. Rolling shafting supporting structure sort is metal wall and welded with the basement together to have rigidity.
E. Cycloidal pin EPT velocity EPT motor EPTn, the again/EPT roller EPTn by EPT, element of higher/reduced rollers EPTn by EPT
F. Modify the screw bar manually to alter the distance between upper/lower rollers for difference thickness of sheet.
(Interest: all rolling program has altered in our business as a ideal predicament, we will not recommend to adjust the rollers at random, if required, ought to alter by a knowledgeable technician or right after train by our engineer. Otherwise will lead to the EPT can not form a excellent profile
Chopping gadget
A. Adopts submit cutting, the reducing blade substance is Cr12 with quenched remedy, soon after cutting, there is no materials squandered.
B. Adopts welded frame for good rigidity.
C. The slicing action is droved by the EPT from EPT station which guarantees the procession of the cutting and lower noisy, EPT daily life.
EPT System
It is managed by EPT wheel oil pump. Following filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to get started the chopping job.
The technique incEPTs a established of EPT tank, a set of EPT oil pump, two EPT pipes. And two sets of electromagnetism valves.
EPT of the oil pump: 3kw
EPT oil: forty#
PLC management system
It adopts EPT computer to handle. The target piece’s length is adjustable and digit of it can be altered. Computed mode has two modes: computerized and guide 1. The program is straightforward to run and use.
Processing precision: inside of 1.00mm
It contains liquid crystal EPT, programmer, transformer for the digital EPTs and kits of each and every part. Touch EPT
PLC is EPTiwan Panasonic
Transducer manufacturer is EPTiwan Delta
The vendor need to provide EPT and EPT language EPT
Counter
A single counter gauges size, pulses, and decides size.
Operate steps
To examine EPT video clip or a lot more confuse, speak to with me
We EPT market to lots of nations around the world
Our certification
Organization details
EPT team is a skilled maker creating and making roll forming EPTs estabEPTd in June 1996. We have 4 factories working in BeiEPTg, TianEPT and ZheJiang province. A lot more than 400 workers supply provider for u.
EPT mainly incEPT trapezoidal steel roof/wall panel EPT, C ampZ form purline EPT, highway guardrail EPT, sandwich panel production line, deck forming EPT, C U L ligEPT keel EPT, shutter slat door forming EPT, reducing EPT, downpipe EPT, gutter EPT, and many others.
How to visit us?
Our services
1. Free of charge specialized help and cost-free equipment supply.
two. Engineer accessible to service EPTry overEPT.
3. 1 yr guarantee is presented.
4. EPT lifestyle technological direction for free of charge.
5. We alwaEPToffer technological support, fast response, all your inquire will be replied in 24 hours.
Question amp Solution
1. Q: How to visit our company:
A: Fly to BeiEPTg Airport: By rapidly train From BeiEPTg South station to HangEPT west station
(1hour), then we can pick up you to manufacturing unit(40min).
B: Fly to ZheJiang Airport: By quick train From ZheJiang XiHu (West Lake) Dis.hu (West Lake) Dis.ao station to HangEPT west
station(four.five hours), then we can select up you to manufacturing facility(40min).
two. Q: What need to I supply if I want to custom-made EPT?
A: U want offer profile drawing, material, thickness, voltage and your EPT specifications.
3. Q: What is the Guarantee?
A: In twelve mounts, all technicals are ready to serve you at any time.
4. Q: What can you do if the EPT damaged?
A: Our EPT’s warranty interval is 12 months, if the broken parts cannot restore, we will deliver
new components substitute the damaged parts free, but you need pay the specific EPT if right after warranty time period. we can negotiate to remedy the difficulty, and we source the specialized assist for EPT lifestyle of gear.
five. Q: If need to have technician to workshop to debug and instruct, how to do?
A: We sent technician to your nation to correct the EPT. Consumer should bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, spherical journey ticket and ideal lodging, also consumer must pay out the income a hundred USD/working day.