EPG has been successfully accredited by ISO9002 High quality Administration Program, ISO9001 Quality Administration Technique, API certification, ISO/TS16949:2002 and ISO10012 measurement management technique. The high specific CNC products, this sort of as Sluggish-feeding wire-cut equipment, jig grinding machine and electric powered discharge machine, assures the best quality precision of mould processing, with the large effective and environmental defense acid rolling line becoming the greatest raw material converting equipment in the discipline in china The wildly use of automated milling machine, higher-pace automated feeding punch, high pace automated rolling and assembling device assures the substantial top quality and performance of components and chain creating. Our AdvantagesProducts Huge volume in Stock, No MOQ needed We comply with all the worldwide requirements, these kinds of as ISO9001 and TS16949 specifications. EPT clamp, centralize the web and flange, align and weld them together. The H beam computerized assembly EPT can increase the working efficiency by more one time than guide procedure. The primary engine EPT is managed by EPTed AC frequency adjustor to make positive stable and trustworthy. There is pilot arc device to guarantee welding quality and precision.
Main Characteristics:
1, EPT framework sorts: EPTry stationary, workpiece automated by means of
two, Applicable workpiece specs: Net top: two hundred-2000MM
Flange width: 200-800MM Duration: 4000-15000MM
three, Clamping way: Internet and flange automatic clamping
4, EPT method: With the stress keep and time delay
five, Major EPT handle: AC motor cycloidal EPT
6, Undertake EPTed EPT of frequency converter to AC frequency convertor centralizes and locates the internet and flange, and recognize automatic functioning
7, CO2 gas shield welding or guide welding is optional for person.
Assembling EPT: (Framework Theory)
(one)Host EPT: IncXiHu (West Lake) Dis.Hu (West Lake) Dis. Principal EPT roller bearing EPT components, the door body unit, clamping device of net, wing powEPTcompact gadget, EPT alignment device, and many others.
(two)the pull rodof the system: On the bar technique mostly incEPTs: Pull rod box, rod oil cylinder, pull rod. When not established of wing, world wide web EPT into the EPT, the wings, not in the necessary situation precision, world wide web and web need to have support at this time. Rod for the program is ready to wing, net preliminary positioning and its process are respectively, by the surface area rigidity in the oil cylinEPTand the internet of the tensioning oil cylinEPTcontrol. Pull rod box by pull rod related among every single other.
(three)Enter roller: Enter of raceway is mostly with the input method of hbeam, it is composed of, passive and energetic raceway groove, the arrangement and the spacing amongst rolling suitcase.
(4)Output roller: Output of raceway is mainly with the output procedure of hbeam, it is made up of, passive and energetic raceway groove
(5)EPT program assembly: EPT technique largely incEPTs: EPT pump station, the major stress cylinder, wing plate positioning cylinder, internet positioning cylinder, wing powEPTtigEPT oil cylinEPT(3pcs), internet clamping cylinEPT(2pcs), rubber hose, oil pipe, seamless metal pipe.
Model | Z15 | Z18 | Z20 |
net heigEPT mm | two hundred-1500 | two hundred-1800 | 200-2000 |
net thickness mm | six-32 | ||
web duration mm | 4000-15000 | ||
flange width mm | 200-800 | ||
flange thickness mm | six-forty | ||
assembly pace mm/min | 500-6000 | ||
feeding desk roller mm | 2600 times2 | ||
output table roller mm | 2600 times2 | ||
centralized way | EPT url mechanism clamp, centralize and weld in the center automaticly | ||
pace manage | EPTed AC frequency adjustor stepless alter | ||
enter volumn | 16KVA Except wellding EPT | ||
welding method | two sets of CO2 defending welding EPT |
Specification:
EPT clamp and centralize the internet and flange, alignment and welding, can improve the doing work efficiency by a lot more one time than comparable items. The principal motor EPT is managed by EPTed AC frequency adjustor to make positive secure and trustworthy. There is pilot arc unit to make sure welding top quality.
The positioning of web and flange is recognized with EPT EPT, on the two sides, the mechanical clamping and centralizing is acted synchronously, to make certain internet and flange positioning with a variety of dimensions in authorized variety.
The automated centralizing is correct and unnecessary to change each time(no cEPTr deviation wheel for slight adjustment). When assembling, there is automated EPT EPT frame which can go up and down, to make sure net and flange are in matched place. The upper beam has 4pairs of XiHu (West Lake) Dis.Hu (West Lake) Dis. on the left and rigEPT to make confident stabilization.
The automatic welding technique is EPTn by ligEPT cylinEPTwithout compressed air source. The inlet and outlet desk roller and inlet stress rod are EPTal type, and can include and take away in accordance to client require.
The principal motor utilizes AC frequency reworking speed adjustor to manage speed. The EPT method has stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd products with precision filter, to guarantee EPT lifestyle and steady perform of magnetic valve.
EPT scope:
1, The major construction: primary body, higher gate frame, synchronous clamping and centralizing program of web and flange, major EPT motor EPT.
2, Inlet desk roller system: active and passive table roller: two.6m*3sets, pressure rod: 3 sets.
three, Outlet desk roller system: active and passive desk roller: two.6m*3sets.
4, EPT system: oil bump station, large pressure rubber pipe, and EPT cylinder.
5, Electrical control system: electrical cabinet, AC frequency converter and and so forth.
FAQ:
Q1: I knew nothing about this EPT, how am i know this EPT will meet up with my doing work needs?
Make sure you inform us your workpiece measurement or display specific drawings, we will give you specialist options.
Q2: When I acquired this EPT, but I do not know how to use it. What ought to I do?
We give overEPT support and EPT guide, after set up, if any troubles occur, we offer you the remote movie guidance and charging overEPT support.
Q3: If some troubles happen to this EPT in the course of guarantee interval, what ought to I do?
Get in touch with us right, we will offer free components for the duration of EPT warranty period of time. Although we also supply cost-free life EPT following-income provider.
Q4: If i want go to your manufacturing facility, how can i get?
Organization handle:39#, LianXiHu (West Lake) Dis.Hu (West Lake) Dis. U enterprise park, HangEPT city, EPTngsu, EPT
Manufacturing facility deal with:EPT EPT Park, EPT HangEPT Town, EPTngsu, EPT
one), Visa: if u need get a govt visa, pls shell out 20%(at lEPT) prepayment for new client. HangEPT authorities restrictions. Thanks for assistance.
two), By practice: HangEPT station. By air: HangEPT ShuoEPT Airport. We will EPT u to our manufacturing unit. 180km between HangEPT and HangEPT city.
Q5: Why your product sales office at HangEPT, but your manufacturing unit situated at HangEPT?
ten years ago. In response to the HangEPT federal government investment invitation, our leaEPTmoved the manufacturing unit from HangEPT to HangEPT, purchased 15,000 square meters of land and constructed factories. In orEPTto reduce production EPTs and sustainable deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment.
Tips: At current, the EPTngsu govt is constructing the provincial high-velocity railway. It is expected that HangEPT will open the subway in 2571.
Make contact with:
Internet site http://yaoEPTgwelding.en.made-in-china.com
EPT YaoEPTg EPTry Manufacture Co.,Ltd Factory Addr.: EPTngyang City, EPT HangEPT town, EPTngsu, EPT
EPTngsu Silver Coast Intercontinental EPT DeveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment Co.,Ltd Workplace: #39 LianXiHu (West Lake) Dis.Hu (West Lake) Dis. U Valley,HangEPT metropolis,EPTngsu,EPT